![RIBA Stage 2 hero photo](/imager/uploads/1722/dundas7_2020-10-27-102651_1f754bbd6c27a775304a0f882c8de572.png)
RIBA Stage 2
Attend design team meetings as required.
Prepare cost plan based on measured quantities & current prices as far as possible for the selected scheme.
Provide guidance of cost effect of alternative materials & methods of construction.
Provide guidance on likely VAT liability.
![img](/images/timthumb.jpg)